Free Estimate



Type the code (displayed below) in the text box.
PRODUCT GALLERY

PAVER PATIOS

Click on the images below to view a larger display.

1 | 2 | 3 | 4Next »


Photo 1


Paver Patio
Photo 1
Paver Patio
Photo 2
Paver Patio
Photo 3
Paver Patio
Photo 4
Paver Patio
Photo 5
Paver Patio
Photo 6
Paver Patio
Photo 7
Paver Patio
Photo 8
Paver Patio
Photo 9
Paver Patio
Photo 10
Paver PatioPaver PatioPaver PatioPaver PatioPaver PatioPaver PatioPaver PatioPaver PatioPaver PatioPaver PatioPaver PatioPaver PatioPaver PatioPaver PatioPaver PatioPaver PatioPaver PatioPaver PatioPaver PatioPaver PatioPaver PatioPaver PatioPaver PatioPaver PatioPaver Patio

HOW TO INSTALL A PAVER PATIO OR WALKWAY

Preliminary Decisions:

  • Compaction of the soil sub-grade and aggregate base materials are essential to the long-term performance of an interlocking concrete paver patio or walkway.
  • Drainage should also be addressed in the system.

Installing a Paver Patio or Walkway:

  • Lay out the paver patio or walkway by spray painting the design on the grass or using a garden hose to get a good feel for how the client wants it to look.
  • Remove the grass with picks and shovels and store it until the project is completed. Put some back against the patio at final completion for back fill and sod.
  • Frame up the design with flexible plastic edge restraints that also work well for the rounded corners.
  • The client must approve the forms before we install the paver system.
  • Install the plastic edging using 12″ spikes to keep the edging in place.
  • Compact the soil sub-grade using a vibrating machine and test for compaction (critical).
  • Apply a Geo-textile fabric over the compacted soil so as to not co-mingle the Virgina Red Clay soil with the next layer of sub-base.
  • Spread and compact the sub-base of 21-A stone aggregates, using 2″ lifts to a total of 4″. To achieve a 2″ lift you must compact 3″ of gravel.
  • Spread, compact and screed (level off) the base of concrete sand in a 1″ lift.
  • Place concrete pavers in the correct pattern and lock into place.
  • Cut pavers to fit edges and around obstacles such as deck posts.
  • Install concrete sand between the paver joints and vibrate the pavers to "lock in" the pavers to one another.
  • Sweep in our upgraded polymeric sand. Polymeric sand has a glue base and will harden and not erode as quickly. That means no tracking of sand in the house, no erosion thru the patio and no ants nesting in it.
  • Compact concrete paver patio or walkway using the same compactor as for the soil compaction; however, change the plate to a rubber plate so as not to scuff the stones.
  • Blow off the paver patio or paver walkway with a leaf blower to remove any residue (glue) from the surface.
  • Lightly spray with water and let sit for 15 minutes.
  • Spray again and let cure.
  • You should be able to use your paver patio or paver walkway in 24 hours.
  • For driveways we go an additional 2" deep.